Cyber Resilience Act dates you cannot ignore

Home / Blog
CRA Dates

Regulation (EU) 2024/2847 — the Cyber Resilience Act (CRA) — is already published. The question is no longer whether to prepare, but when to tackle each block of work. Many manufacturers still treat the CRA as a single end date, as if it were enough to “have the file ready in 2027”. In practice, the Regulation applies in phases. Some obligations arrive before general application, and that sequence should shape the whole compliance roadmap.

The three dates that matter most

On 11 June 2026, Chapter IV provisions on the notification of conformity assessment bodies start to apply. This is not yet the date when every product must comply with the Regulation, but it is when the conformity assessment ecosystem should start becoming operationally available. If your product may require third-party involvement, this date matters for planning interactions, capacity and lead times. Leaving everything to the final quarter usually creates bottlenecks rather than savings.

11 September 2026 is probably the most underestimated date in the calendar. From then on, Article 14 applies: reporting obligations for actively exploited vulnerabilities and severe incidents. It is not enough to “think about” a vulnerability process. You need a visible reporting channel, clear roles, triage criteria, a real ability to analyse impact across versions and components, and an organised way to communicate when required. For many manufacturers, this milestone should come ahead of the rest of the technical file, because it depends more on organisation and operations than on drafting another annex.

The date everyone remembers is 11 December 2027, the general application date. From then on, products with digital elements placed on the EU market must meet the applicable CRA requirements, subject to the exclusions and transitional rules provided. Products already placed on the market before that date are only subject to certain obligations if, from that date, they undergo substantial modifications within the meaning of the Regulation. Reaching 2027 without first resolving the 2026 processes is one of the most expensive ways to “comply late”.

What to prioritise, and why that order

A realistic plan usually starts with what is closest in time and most organisationally demanding. The first step is usually to establish or mature vulnerability and incident processes: channel, triage, analysis, remediation and communication. Without that, the rest of the file describes a product that cannot be maintained in a defensible way.

Next comes product scope and risk assessment. Without a clear baseline — what the product is, which versions are in scope, which interfaces and dependencies matter — evidence fragments and every document tells a different story. On that foundation it makes sense to work on the component inventory and product maintenance, because they are the operational tools for impact analysis and lifecycle control.

Only once that core works is it efficient to deepen product security properties, technical documentation and the declaration of conformity. In parallel or shortly afterwards, define the conformity assessment route: anticipate whether third-party support will be needed and with what lead time, rather than discovering it when the calendar no longer forgives delay.

Mistakes that keep repeating

The most common mistake is treating the CRA as a documentation project for late 2027. The second is starting with the declaration of conformity before scope, risks and processes are settled: the paperwork may look polished, but it will not support a serious assessment. It is also common to assume that compliance with another framework — for example, RED cybersecurity requirements — equals CRA compliance. It helps as a foundation; it does not close the file. And leaving the vulnerability channel “until a notified body exists” usually arrives too late: that obligation does not wait for the rest of the market to be perfectly ready.

Share: